Sustainability

EUDR Applies from 30 December: Large and Medium Operators Face Due Diligence and Plot-Level Traceability

The postponed EU Deforestation Regulation applies from 30 December 2026 for large and medium operators, and 30 June 2027 for micro and small enterprises. Due diligence remains anchored in plot-level traceability.

Under the postponement introduced by Regulation (EU) 2025/2650, the EU Deforestation Regulation applies from 30 December 2026 for large and medium operators, and from 30 June 2027 for micro and small enterprises. The European Commission has confirmed that the core text will not be substantially rewritten, and due diligence obligations remain anchored in supply chain traceability down to plot level.

Scope covers commodities including timber, coffee, cocoa, soy, palm oil, rubber and cattle, together with derived products, as defined by Annex I and the corresponding HS codes. On responsibility, the first operator placing the goods on the EU market holds the due diligence obligation and must submit a due diligence statement; downstream operators and traders must collect, retain and pass on the statement reference number for five years. Customs declarations require that reference number, or the identification number of a micro or small primary producer, along with the relevant tariff code. TARIC codes were updated in September 2026 to reflect the amended regulation.

The consequences are significant: fines of up to 4 per cent of EU-wide turnover, seizure of non-compliant products, confiscation of profits and exclusion from public procurement. Non-compliant products may not be placed on the EU market, made available on it, or exported from the EU.

With seven weeks to go, we recommend four steps: check Annex I to confirm whether products are in scope; obtain plot-level geolocation coordinates from suppliers, at a precision of at least six decimal places, together with producer information; map your role in the chain and decide whether you must submit a statement yourself; and fix responsibility for passing on reference numbers in customs handling and customer contracts. Reimporting goods previously placed on the EU market does not require a new statement, but the earlier placement must be demonstrable through invoices, delivery notes or similar records.

News & Insights

Certification

SAMR Questions 15 Electric Bicycle Makers after Full-Coverage CCC Certification Flight Inspections

On 27 November SAMR questioned 15 electric bicycle manufacturers including Yadea, Tailing and Aima. A full-coverage flight inspection of CCC certification had found weak quality responsibility and poor product consistency controls, with some companies selling nonconforming products in breach of mandatory national standards. The regulator demanded strict one-bike-one-battery-one-charger-one-code controls and immediate recalls of defective products.

Read more
Industry Governance

MEE Reports on Testing Body Oversight: Five Agencies Combat Data Fraud as Key Data from 17,000+ Vehicle Inspection Bodies Are Linked Nationally

At its 27 November press conference, the Ministry of Ecology and Environment reported that five agencies launched a crackdown on fraudulent environmental monitoring on 18 September. Self-inspection is complete and spot checks are under way, with dual penalties for institutions and individuals and information sharing on industry bans. Key data from more than 17,000 vehicle inspection bodies and 6.3 million heavy-duty vehicles are linked at three levels; over 1,400 unlawful bodies have been investigated and more than 50 have lost their qualifications in 2026.

Read more
Standards

ISO Publishes ISO/TR 24962:2026 on Sampling-Based Conformity Assessment Covering Processes, Lots and AI Classification Systems

ISO has published ISO/TR 24962:2026, Sampling-based conformity assessment, with status Published at stage 60.60; China’s national standards platform records the release date as 27 November 2026. The 74-page technical report from ISO/TC 69/SC 5 sets out how prior information can be used to design acceptance sampling plans, including for accuracy acceptance of AI classification systems.

Read more