At a press conference on 18 November, SAMR said its special equipment enforcement notice makes inspection fraud a priority. In October two inspection bodies had qualifications revoked for false reports and out-of-scope inspection, with staff referred to prosecutors.
On 18 November 2026 SAMR held a press conference in Beijing on preventing major safety risks in special equipment, reporting progress and naming inspection fraud as an enforcement priority. The General Office has issued a notice on a special equipment enforcement campaign built around four strands: cracking down on unlicensed production, use and operation, the absence of valid inspection reports and illegal operation; combating forged, altered, traded, rented or lent qualification certificates and inspection reports; targeted checks on high-risk equipment; and regulating examination bodies for operators.
The signal for inspection is direct. In October 2026 SAMR handled two serious cases. Shandong Special Equipment Inspection Group issued false tanker inspection reports using one vehicle with multiple plates, inspections where the vehicle never attended and inspection by substituting vehicles. The Baotou branch of the Inner Mongolia Autonomous Region Special Equipment Inspection and Research Institute carried out inspection beyond its scope and failed to inspect in accordance with safety technical specifications, and was found responsible in the Baogang 18 January major vessel explosion. Both bodies had the relevant inspection qualifications revoked, and the personnel involved were referred to judicial authorities.
Two institutional tracks run in parallel. SAMR has issued guidance on promoting high-quality development of special equipment inspection bodies, confirming their public-interest character and setting measures on institutional layout, technical capability, conduct and technical support. It is also advancing a supervision and administration measure for special equipment inspection and testing, addressing insufficient criteria for identifying false and inaccurate reports, penalties that are not granular enough and irregular conduct, while regulating subcontracting, out-of-region inspection, hazard reporting and public disclosure of practice.
The numbers show the granularity of supervision. Over the three-year campaign, 153,500 elevators with hazards were identified, 8,422 cases involving site-specific motor vehicles were filed, and 2.4681 million safety directors and 2.8606 million safety officers were appointed. For saturated steam spherical vessels, all 172 units under construction or in use were screened; design life for new vessels is capped at 12 years instead of the usual 20, first inspection intervals shorten from three years to one, and an inspection quality campaign requires open-vessel inspection, stronger surface defect testing and cross-checks between inspectors and reviewers.
Three consequences follow for inspection bodies. Report quality and personnel qualification are now high-voltage lines: out-of-scope inspection, deviation from safety specifications, plate substitution and reports issued without attendance can lead to revocation and criminal liability, so bodies should review authorised scope, certified items per inspector and on-site witness records. Subcontracting and out-of-region inspection will come under scrutiny, requiring documented evaluation of subcontractors, clear boundaries of engagement and allocated responsibility rather than using subcontracting to sidestep capability limits. Buyers should verify that an inspection body's scope covers the equipment category and level, that report signatories are authorised, and that public practice disclosures are consistent, making compliance part of supplier admission. Third-party bodies can support quality system diagnosis, report compliance review and inspector competence development.